Basically I want to download 10 different files, so I'm using 10 different projects, and I want them to run 1 after the other (not at the same time) and after the last project is run, I will have a RunAfter parameter to do extra processing.
Is this possible with the sequencer?
Regards,
Bryan
>
> Basically I want to download 10 different files, so I'm using 10 different projects, and I want them to run 1 after the other (not at the same time) and after the last project is run, I will have a RunAfter parameter to do extra processing.
>
> Is this possible with the sequencer?
> Regards,
> Bryan
Ok, I've just noticed that if I put 10 projects in the sequencer, they will run in sequence, but then they dissappear from the sequencer. How do I keep them there... My goal is for these project to always run in sequence and not at the same time.
Thanks!
Bryan
Best regards,
Oleg Chernavin
MP Staff
>
> Best regards,
> Oleg Chernavin
> MP Staff
Ok, I've turned of the Scheduled download time in the Project properties, and have moved 10 projects down to the sequencer. I set the "Start Sequencer at" setting to Every 0:20. I'm assuming that this is every 20 minutes, but it seems to start the download sequence every 2 minutes (maybe less). Is the timer not working correctly?
I would like the sequence to start every 20 minutes.
Thanks for your continued help.
Best Regards,
Bryan